Six steps, one point of contact.

Renovation is routine for us but exceptional for you. At every stage you know what will happen, what it costs and when it will be ready.

  1. Consultation & survey

    week 1 · free

    We visit, measure and listen to what the space must achieve and what the budget allows. You receive an honest first estimate.

  2. Concept design & fixed price

    weeks 2–3

    You receive a concept plan and one fixed price broken down into structure, envelope and finishing.

  3. Engineering & permit

    weeks 3–11

    Our engineer checks the foundation and structure. If required, we submit the complete permit file.

  4. Preparation & programme

    parallel with step 3

    Materials, windows and the weekly schedule are prepared, including the days when parts of the home are unavailable.

  5. Construction

    average 3–4 weeks

    One team works from foundation to finish. We make the new volume weatherproof before opening the existing house.

  6. Handover & guarantee

    final week

    We inspect everything together and provide drawings, calculations, guarantees and a written handover record.

During construction

Living at home while we build

Three practical agreements keep construction manageable.

Weatherproof before opening

The existing façade or roof is opened only once the new structure is closed.

Clean at the end of each day

Dust screens, protected routes and a swept site are part of the daily routine.

Friday update

Every Friday you receive photos, progress and the plan for the following week.

First step: a free consultation

Book a free consultation. We will review the options, the permit situation and an initial cost estimate — with no obligation and a reply within one working day.