Six steps, one point of contact.
Renovation is routine for us but exceptional for you. At every stage you know what will happen, what it costs and when it will be ready.
Consultation & survey
week 1 · freeWe visit, measure and listen to what the space must achieve and what the budget allows. You receive an honest first estimate.
Concept design & fixed price
weeks 2–3You receive a concept plan and one fixed price broken down into structure, envelope and finishing.
Engineering & permit
weeks 3–11Our engineer checks the foundation and structure. If required, we submit the complete permit file.
Preparation & programme
parallel with step 3Materials, windows and the weekly schedule are prepared, including the days when parts of the home are unavailable.
Construction
average 3–4 weeksOne team works from foundation to finish. We make the new volume weatherproof before opening the existing house.
Handover & guarantee
final weekWe inspect everything together and provide drawings, calculations, guarantees and a written handover record.
During construction
Living at home while we build
Three practical agreements keep construction manageable.
Weatherproof before opening
The existing façade or roof is opened only once the new structure is closed.
Clean at the end of each day
Dust screens, protected routes and a swept site are part of the daily routine.
Friday update
Every Friday you receive photos, progress and the plan for the following week.
First step: a free consultation
Book a free consultation. We will review the options, the permit situation and an initial cost estimate — with no obligation and a reply within one working day.